Resource Details
Energy, Sustainability, Transportation
Charging and Fueling Infrastructure Grants (Corridor Charging)
Program funds will be made available to deploy electric vehicle charging and hydrogen/propane/natural gas fueling infrastructure along designated alternative fuel corridors and in communities.
The federal cost share requirement is 80% Federal, 20% non-Federal.
Eligibility
ELIGIBLE RECIPIENTS include: State or political subdivision of a State, Metropolitan Planning Organizations, Local government, Special purpose district or public authority with a transportation function, Tribe, Territory
ELIGIBLE USES include: Acquisition and installation of publicly accessible electric vehicle
charging or alternative fueling infrastructure, operating assistance (for the first 5 years after installation), acquisition and installation of traffic control devices.




